top of page
Modern Bridge

MCDERMID CONTROLS

Leading independent Building Energy Management (BMS) Specialist and Control Panel manufacturer based in Scotland

Home: Welcome

SERVICES

What’s Provided

IMG_8357.jpg
1605264346185_edited_edited.jpg
IMG_0310.jpg

CONTROL PANEL MANUFACUTRE

Exceptional Service

BMS PACKAGED SOLUTIONS

Satisfaction Guaranteed

BMS COMMISSIONING

Here For You

Home: Services

WHAT WE’VE WORKED ON

A Few Highlights

exterior.jpg

MOXY HOTEL EDINBURGH AIRPORT

Moxy Edinburgh Airport is a short walk to Edinburgh Airport as well as to the public transportation links that connect to the city center and surrounding cities.

​

McDermid Controls provided a complete building management solution including panel manufacture, install, software integration and commissioning. The BMS controlled the hotels heating, cooling & ventilation as well as interfaced with 3rd party manufacturers to display the buildings performance and status all from once central user friendly graphical display.

MAIDENHILL PRIMARY SCHOOL

This brand new school built in the heart of the new housing community of Maidenhill had a very modern design with a brand new nursery attached.

​

McDermid Controls provided 3 controls panels for each part of the school and nursery. The BMS package included, boiler house heating, underfloor heating, air handling units, kitchen ventilation, metering and various 3rd party system integration. All accessible from the facilities managements office front end PC.

MaidenhillPrimarySchool_N2_gtwebland.jpg
_edited_edited.jpg

THE PORTAL IRVINE LEISURE CENTRE

The Portal and Townhouse caters for local and family history, art exhibitions, community and cultural events, as well as sports and leisure activities.

​

The portal was the large modern extension onto the original townhouse. The building comprises of function and exhibition areas, a six lane 25m main pool, a teaching pool, a six-court sports hall, studios, a fitness suite, both wet and dry changing areas, and pool viewing area. All areas of the venue are fully accessible for wheelchair users and those with a disability. 

​

McDermid Controls provided 6 control panels for various applications within the building including, boilerhouse plant, pool heating, underfloor heating, natural ventilation and air handling units.

​

​

Have a project in mind? Get in touch today.

Home: Projects

PARTNERS AND MEMBERSHIPS

Capture 1.JPG
Home: About

CONTACT

10 Albion Way, Kelvin Industrial Estate, East Kilbride,
Glasgow
G75 0YN
UK

01355 571215

  • Google Places
  • LinkedIn

Thanks for submitting!

Home: Contact
bottom of page